WORKFLOWFRAME — B2B RESEARCH PILOT WORKSHEET Version: 2026-09-23 | https://workflowframe.com/guides/apollo-b2b-research-pilot/ Editorial planning template. This is not a live account test or a customer result. Complete locally with permitted data; do not enter credentials. 1. RESEARCH QUESTION Owner / reviewer: Decision supported by the research: Target companies / geography / company size / relevant role: Exclusions (current clients, unsuitable accounts, suppression rules): Required fields and why each changes a decision: Representative comparison sample and source: 2. MANUAL BASELINE Observation dates / sample size: Accepted reviewed records: Missing / incorrect / uncertain fields: Research minutes: Checking and correction minutes: Total minutes per accepted record (include rejected work): 3. FIELD CONTRACT Field | Source of truth | Allowed add/update | Missing/conflict rule Company identity: Company domain: Contact identity and role: Verified customer details: Suppression state: Owner / next action: Research source and review date: 4. ACCOUNT AND SYNC CHECKS Current plan, relevant features and observed usage/credits: Exact search filters and dated pilot list: Integration permissions and field mapping: New records versus existing-record update behavior: Automatic sync timing / overwrite / merge / deletion settings: Isolation boundary (do not assume a push filter isolates the whole CRM): Rollback and manual recovery procedure: Official documentation checked on: https://knowledge.apollo.io/hc/en-us/articles/4416606988941-Configure-HubSpot-Sync-Settings Permission for the research use confirmed by: Outreach is a separate decision and is outside the initial research pilot. 5. TEST LOG — EXPECTED RESULT FIRST Case | Expected result | Actual | Pass/fail | Repair A. Relevant new company: B. Existing verified record: C. Missing required field: D. Wrong company / stale role: E. Multiple possible company matches: F. Repeated operation: G. Suppressed or excluded record: H. Deleted or merged record: I. Partial sync failure: J. Stop connection and return to manual process: 6. COMPARISON AND DECISION Records reviewed / accepted / rejected / uncertain: Field coverage and correct match counts: Total research + review + repair minutes: Observed credits/usage and incremental cost: Cost or minutes per accepted result: Pre-agreed quality and effort thresholds: Any harmful overwrite or wrong-company write: Stop condition / responsible person: Keep / narrow / stop, and why: Next review date: Inspect the ordinary workflow assessment: https://workflowframe.com/tool/?scenario=lead-enrichment